NoBreakAdsBlogMCP Create an account

Schedule Hermes Agent routines with the right time zone and destination

A 9 a.m. job can still select an unfinished day in the ad account. Check the schedule’s time zone, the report dates and the destination separately.

Verify the next Hermes Agent run in the job's time zone and specify the reporting period separately. A job can fire at 9 a.m. in São Paulo while reading yesterday's closed data in a different ad account time zone. The destination has its own configuration. Hermes scheduled tasks

Step by step

Set the job’s time zone

Use a Hermes profile with a working gateway and authorized pilot data. Keep the first output local.

hermes cron create "0 9 * * 1-5" --timezone America/Sao_Paulo --deliver local "Read yesterday in the pilot account's time zone. Save a local summary with ID, currency and dates."

What to check · The job displays 09:00 São Paulo time. The prompt separately defines the reporting period using the account's time zone.

If it goes wrong

If the date differs, verify the IANA zone and name the account's time zone in the prompt.

Check when the job ran and which dates it reported

Check scheduler health. Use the ID shown by the listing to run the local test and inspect its record.

hermes cron status
hermes cron list
hermes cron run <id>
hermes cron runs <id>

What to check · The run records an outcome and a data period. You can compare the scheduled time, manual dispatch and reporting window.

If it goes wrong

Check the profile's gateway and logs if the scheduler is down. Resolve source read errors before changing delivery.

Test an internal delivery target

Set the pilot job's target using the documentation for your connected adapter and run it once.

Acceptance record: job ID | run | timestamp | approved internal chat | channel confirmation

What to check · The output arrives in the intended chat and can be linked to the run.

If it goes wrong

If it does not arrive, inspect the adapter identity, actual target and run status before another attempt.

Put the NoBreakAds MCP to work

In a supported client, use NoBreakAds MCP to check the report automation’s upcoming runs. Compare the scheduled time, time zone and configured destination with the Hermes scheduling test. Use the preview, where available, to confirm the reporting dates. Explore WhatsApp reports · Create an account.

Related guide: What to do when a paid media agency’s MCP connector fails

Find out whether timing, execution or delivery failed

Check the profile and gateway status, then the next scheduled time and the last run result. Run hermes cron status and hermes cron list where the job runs. Use an internal destination and record the expected start, actual start and data window. Verify the timing and have someone at the test destination confirm receipt. Cron troubleshooting

After confirming that the run started on schedule, check the send receipt by message ID to see whether the report arrived.

Illustrative scenario

Say a job runs at 9 a.m. as scheduled. The ad account uses a different time zone, so the report includes a day that hasn’t ended there yet. The team fixes the date calculation to use the account’s time zone.

Frequently asked questions

Does a manual run verify scheduling?

Test execution manually, then observe a real scheduled occurrence at the intended time.

What if the file exists and the channel has nothing?

Check the configured destination and delivery evidence. Producing a file and delivering it are distinct steps.

Which date should a run near midnight use?

In a dry run, the task starts in São Paulo at 12:30 a.m. on July 7. The account uses UTC−5, where it is 10:30 p.m. on July 6. The last closed account day is July 5. If the report uses July 6, fix interval selection to use the source time zone and rerun at the same test time.

Sign up for NoBreakAds and set a delivery window for your first report.

Sources and documentation

Optional measurement

Choose whether we can measure visits and ad performance. Privacy policy.